Skip to Main Content
Frequently Asked Questions
Submit an ETD
Global Search Box
Need Help?
Keyword Search
Participating Institutions
Advanced Search
School Logo
Files
File List
osu1110384150.pdf (3.54 MB)
ETD Abstract Container
Abstract Header
Sediment transport and channel adjustments associated with dam removal
Author Info
Cheng, Fang
Permalink:
http://rave.ohiolink.edu/etdc/view?acc_num=osu1110384150
Abstract Details
Year and Degree
2005, Doctor of Philosophy, Ohio State University, Civil Engineering.
Abstract
Dam removal has recently become one of the most controversial issues among the environmental society community in the United States. Release of reservoir sediment is the main uncertainty associated with this issue. This study has extensively documented the short-term changes in channel geometry, bed level profile, size distribution of substrates, and their relations with the sediment transport at the reach scale after a low-head dam removal. Before the complete removal, the structure was breached to de-water the reservoir. The suspended sediment concentration (SSC) and discharge downstream of the dam showed nearly no change during the breach. In contrast, the complete removal of the structure produced a sudden increase in downstream discharge and SSC. However, the amount of increase was insignificant compared to the annual rainfall event. The SSC within 10 months after the removal showed no significant difference with that of SSC before the removal. No bank erosion was evident at both upstream and downstream of the dam; while net deposition occurred downstream and net erosion occurred in the reservoir. Deposition and scouring were evident in the reservoir with overall decrease by 30% in bed slope. Deposition measurements showed up to a 20 cm increase in bed level downstream of the dam. Downstream bed materials size became at least 40% finer for post-removal conditions than for pre-removal conditions as a result of deposition of finer materials. High resolution Digital Elevation Models (DEMs) of the river bathymetry were generated from differential GPS surveys. The volume of deposition and erosion was computed from differencing the DEM for post-removal from the DEM for pre-removal. Compared with the observations, the transport rate estimated from the DEMs overestimated the transport rate within an order of magnitude. A 1-D hydrodynamic model, calibrated with the observations showed promising simulation results on the dynamics of dam removal and sediment transport. The major features described by the model were: 1) the magnitude and timing of the flood wave during the dam removal; and 2) the bed level adjustments after dam removal. Sensitivity analysis showed that the model was strongly dependent on the size distribution of the reservoir substrates.
Committee
Tim Granata (Advisor)
Pages
99 p.
Keywords
dam removal
;
channel adjustment
;
sediment transport
Recommended Citations
Refworks
EndNote
RIS
Mendeley
Citations
Cheng, F. (2005).
Sediment transport and channel adjustments associated with dam removal
[Doctoral dissertation, Ohio State University]. OhioLINK Electronic Theses and Dissertations Center. http://rave.ohiolink.edu/etdc/view?acc_num=osu1110384150
APA Style (7th edition)
Cheng, Fang.
Sediment transport and channel adjustments associated with dam removal.
2005. Ohio State University, Doctoral dissertation.
OhioLINK Electronic Theses and Dissertations Center
, http://rave.ohiolink.edu/etdc/view?acc_num=osu1110384150.
MLA Style (8th edition)
Cheng, Fang. "Sediment transport and channel adjustments associated with dam removal." Doctoral dissertation, Ohio State University, 2005. http://rave.ohiolink.edu/etdc/view?acc_num=osu1110384150
Chicago Manual of Style (17th edition)
Abstract Footer
Document number:
osu1110384150
Download Count:
3,683
Copyright Info
© 2005, all rights reserved.
This open access ETD is published by The Ohio State University and OhioLINK.